Project case study
Brightwater Aged CareElectrical Infrastructure Upgrades incorporating KNX Automation System and AV.
Brightwater Aged Care
![](https://janissenelectrics.com.au/wp-content/uploads/2020/01/divider.png)
Project Infrastructure Upgrades
Client Brightwater Aged Care
Builder Dawn Express
Interior Design MKDC
Photography Osprey Photography
Project Value $8M
Date Commenced October 2018
Estimated Completion Date Autumn 2021
This project incorporated a new lighting design and new fittings, and a KNX lighting control system that can be monitored remotely offsite, controlling the automated dimming with ambient light levels preset to dim at certain times during the day. The result was a drastic improvement to lighting levels, increasing the comfort of staff and residents and reducing operating and maintenance costs.
- Installation of automated KNX lighting system
- Replacement of existing fittings with LED
- Upgrade of AV systems
- Site was “live” with residents in care, requiring careful planning with key stakeholders
Related projects
![](https://janissenelectrics.com.au/wp-content/uploads/2020/01/divider.png)
View our latest projects ranging from project management to design and construct.
A TRUSTED AND HIGHLY EXPERIENCED COMPANY
![](https://janissenelectrics.com.au/wp-content/uploads/2020/01/divider.png)