Project case study
The Cove – Brightwater Aged CareElectrical Infrastructure Upgrades incorporating KNX Automation System and AV.
Brightwater Aged Care
Project Infrastructure Upgrades
Client Brightwater Aged Care
Builder Dawn Express
Interior Design MKDC
Photography Osprey Photography
Project Value $1M
Date Commenced July 2019
Estimated Completion Date January 2021
This project incorporated a new lighting design and new fittings, and a KNX lighting control system that can be monitored remotely offsite, controlling the automated dimming with ambient light levels preset to dim at certain times during the day. The result was a drastic improvement to lighting levels, increasing the comfort of staff and residents and reducing operating and maintenance costs.
- Installation of automated KNX lighting system
- Replacement of existing fittings with LED
- Upgrade of AV systems
- Site was “live” with residents in care, requiring careful planning with key stakeholders